Wall-to-wall airflow kept dancing crews performing at their best, without the power bill.

Problem

Groovit members and staff would suffer in stifling heat throughout summer, during training sessions which were every day in this bustling dance facility.  During the day the admin staff suffered the same issues.  With high ceilings and a roller door which remained shut due to the close proximity of the road, this building stored heat in a big way.  Groovit were looking for a cost effective long term solution and engaged with Jet Black Fan Systems after seeing local testimonials. 

Solution

Jet Black Fan Systems offered a complimentary site check to thoroughly explore the objectives and ensure the correct sized fan would be placed in the best location to achieve maximum airflow coverage across as many members as possible.  They organised their install team to quickly install the fan outside of work hours to ensure the least impact to the business as possible.  The floor had recently been installed and was of great concern, however the install team were contentious and careful to ensure no damage arose. 

Case Study

Santa Antia Park

Read next case study